Installation Guide THEIA HE-t String Inverters 357115.033, Issue 2.0, 2011 March 21
2.3.4.1. Connection Procedures
Figure 2.3.14: Customer connection area with AC terminals
1. AC terminal block:
• GND: Ground terminal
• N: Neutral terminal (TN/TT)
or Phase terminal (IT)
• L: Phase terminal
2. Cable gland
• The AC conductors must be sized for the correct temperature and sunlight resistance. Use
copper wire with a maximum cross-section area of 16 mm
2
/ 6 AWG. Ensure compliance
with the relevant national electrical regulations!
• The AC conductor resistance should be minimized.
• Unscrew the cable gland locknut.
• Guide the AC cable through the opening, and connect the conductors to the corresponding
terminals in the connection area:
• Phase conductor (L1 or L2 or L3) to L
• Neutral conductor (TN/TT) or Phase conductor (IT) to N
• Grounded conductor to GND
• Tightening torque of the terminal screws is between 1.2-1.5 Nm / 0.89-1.11 lbft.
• Double check if the connection is correctly carried out.
• Hand-tighten the gland locknuts to seal the cable gland.
2.3.5. Network Connections
The inverter is equipped with two communication interfaces; Ethernet and CAN. Ethernet
provides communication between the integrated web server and a computer, either directly or
via a router/switch. CAN allows communication between several inverters.
Figure 2.3.15: Network connections
1. Slave inverter
2. Master inverter
3. CAN bus
4. Ethernet
5. Computer